|
1. Authorization:
ASME B.31 Code for Pressure Piping
ASME – Division I Fabrication
AWS D1.1
API –1104
Max Welders has welding procedures and
personnel qualified to all above codes.
2. Plant Facilities:
A. Available yard fabrication area
8 acres
B. Steel storage area
2 acres
C.S hop area
32,200 sq. ft.
D. Warehouse area
5,400 sq. ft.
E. Office area
4,500 sq. ft.
F. Water frontage:
Linear footage
1,800 ft.
Water depth
15 ft.
Barge size
accessible
72’ x 270’ x 16’
G. Future area to be developed
10 acres
H. Total site area
27 acres
I. Steel bulkhead
875 ft.
3. Shipping Facilities:
A. Truck – Maximum height restrictions
of 13’. All other
capabilities within
D.O.T. regulations.
B. Water – Access to Gulf of Mexico via
Bayou Black and
Intracoastal Waterway.
4. Utilities:
A. Propane gas, oxygen gas, argon gas,
CO2 gas, and
compressed air
available throughout yard.
B. Potable water available at 50 PSIG.
C. 480 V / 3 Phase available throughout
yard.
5. Equipment:
A. (1) 275 Ton
Crawler Crane
(2)
110 Ton Capacity Crawler Cranes
(1) 50 Ton Capacity Crawler Crane
(1) 30 Ton Capacity Crawler Crane
(2) 10 Ton Overhead Cranes
(2) 5 Ton Overhead Cranes
(2) 15 Ton Cherry Pickers
B. (2) Man-Lifts
(3) Forklifts
C. (1) 140’ x 40’
x 7’ Spud Barge (Max 102)
(1) 130’ x 34’ x 7’ Spud Barge (Max 103)
Both barges equipped with cranes (50 Ton up to 125 Ton)
6. Welding:
Max Welders has welding procedures and personnel qualified in accordance
with several construction
codes and welding processes.
Portable and in house equipment available for welding carbon and
alloy steels as well as clad materials and aluminum.
7. Services:
A. Hydrostatic and Pneumatic Testing
(In house and sub-contractor)
B. Non-Destructive and Destructive Testing
(Sub-contractor)
C. Heat Treating
8. Blasting and Coating:
A. Air Compressors
B. Conventional Painting and Blasting Equipment
C. Blast Trac Machine
9. Load-Out Capabilities:
A. Crane Lifts up to 90 Tons
B. Skid System up to 1200 Tons
|